By Don Fitchett
If you could not answer with confidence or you answered "No" to any of the above questions, you need to read this article on maintenance management of PLCs. Why? Because the PLCs (Programmable Logic Controllers) are the brains of your operation. When the PLC is not functioning properly, lines shut down, plants shutdown, even city bridges and water stations could cease to operate. Thousands to millions could be lost by one little PLC in an electrical panel that you never even knew existed. But most importantly, damage to machine and personnel could result from improper maintenance management of your company's PLCs.
First I’d like to explain in the most non-technical terms possible, What a PLC is. As this article is not just for the maintenance technician, but for maintenance managers, plant managers and corporate managers. A PLC (Programmable Logic Controller) is the type of computer that controls most machines today. The PLC is used to control AND to troubleshoot the machine. The PLC is the brain of the machine. Without it, the machine is dead. The maintenance technicians we train, are the brain surgeons. That is how I explain it to my doctor any way. (His mouth drops open, "... you train brain surgeons?")
Just as a doctor asks the patient questions to figure out what is wrong, a maintenance technician asks the PLC questions to troubleshoot the machine. The maintenance technician uses a laptop computer to see what conditions have to be met in order for the PLC to cause an action to occur (like turn a motor on). In a reliable maintenance management environment, the maintenance technician will be using the PLC as a troubleshooting tool to reduce downtime.
A programmable controller is a small industrial strength computer used to control real world actions, based on its program and real world sensors. The PLC replaces thousands of relays that were in older electrical panels, and allows the maintenance technician to change the way a machine works without having to do any wiring. The program is typically in ladder logic, which is similar to the wiring schematics maintenance electricians are already accustomed to working with. Inputs to a PLC can be switches, sensors, bar codes, machine operator data, etc. Outputs from the PLC can be motors, air solenoids, indicator lights, etc.
My company has had an ongoing PLC related global maintenance survey since the year 2000. The majority of the participants back in 2001, reported 3-6 PLCs in their facility, that they know of. Granted most participants are managers and don't open electrical panels much, but many of the participants are from fortune 500 companies having hundreds of employees. The odds are most of them have 12-30 PLCs in their facilities. Currently the average is 6-9 reported, so the good news is the industry as a whole is becoming more PLC aware.
It is common to only learn about a PLC once the machine is down and the clock is ticking at a thousand dollars an hour, or more. Unfortunately, it is also common that after the fire is out, it's on to the next fire, without fully learning what can be done to avoid these costly downtimes in the future, and in other similar machines in a company or corporation.
Some older electrical panels may only have relays in them, but most machines are controlled by a PLC. A bottleneck machine in your facility may have a PLC. Most plant air compressors have a PLC. How much would it cost if the bottleneck or plant air shut down a line, a section of your facility, or even the entire plant?
The first step to take is to perform a PLC audit. Open every electrical panel, and write down the PLC brand, model, and other pertinent information. Then go the next two steps. Analyze the audit information and risk, then act on that analysis. To help you out, I want to share with you our company PLC audit form.
Collected Information |
Recommended Action |
Machine or Area Name |
Ex: warehouse conveyor, pump station 3,Strapper 2, Line 7, Traffic signal west main, etc. |
PLC Program Name |
Ex: 1789GAA1, P3, Strap2, 5872443, WestMainTL, etc. |
Network Node Address |
No two addresses will be the same. Ex: 2, 3, 17, 21 |
Network Name |
Common to be same as Program name, but not mandatory. |
PLC Brand |
Ex: Allen Bradley, Siemens, Schneider, Mitsubishi, DirectSoft, Omron |
PLC Model Number |
Ex: PLC-5/25, SLC-504, SIMATIC S5, MELSEC FX1N, DL 405 |
Is Spare Available |
Yes on shelf, or only in less critical machines or no |
Date Program Last Backed Up |
Make program backups part of your semiannual PM program |
Discriptored Copy of program available |
Without discriptored copy of program, troubleshooting and downtime are greatly increased. |
Does PLC have EEPROM |
Or other method of storing backup program in a chip on PLC |
Last date Program Changed |
Remember to log when outside consultants or OEM make program changes too. |
Last date EEPROM Burned |
Should be saved to EEPROM (Burned) after every successful program change. |
Date battery last changed |
See manufacturer’s data for recommended change frequency. |
Other information you may need |
Might be facility location when corporate HQ is using this form. |
Once you have collected the basic information in your Plant wide and/or corporate audit, you need to analyze the information to develop an action plan based on risk analysis. In the risk analysis, bottlenecks and other factors will help you assess priorities. Starting with the highest priority PLC, you will need to ask more important questions.
These are some of the questions our managers must ask, to avoid unnecessary risk and to insure reliability.
Is your maintenance staff trained on the PLC? (Silly to squander over a couple thousand in maintenance training when the lack of PLC knowledge could cost you 10 thousand an hour. ... or worse. I can give you a couple good reasons why you should have at least one trained person per shift, to work reliably with PLCs. You do not want to see greater downtime on off shifts because the knowledge base is on day shift only. Also with all the baby boomers (our core knowledge base in the industry) about to retire, it is not smart management to place all your eggs in one basket.
Then the question should be asked, what should we look for in training. Well I have been training individuals for over a decade and could easily write another article on just PLC training alone. I can tell you here, that you should seek training with two primary objectives.
I feel the two criteria above are the most important. Some other good ideas to get more out of your PLC training investment would be to get hands on training using the actual PLC programs and software the maintenance technician will be working with in the facility. Insure your personnel have the software, equipment and encouragement to continue with self education. PLC Training CBT (Computer Based Training) CDs are a great way for employees to follow up 6 months after the initial training. Some other ideas you could do is to provide them with simulation software and/or a spare PLC off the shelf to practice with.
It seems that in our industrial culture, if policy and procedures are not written and enforced, we eventually stray back to the old unreliable ways. I have reviewed many policy and procedures as well as books on the topic matter and hardly ever see maintenance management of the PLCs included. It amazes me how an organization can write guidelines for what they believe is the health of the entire organization’s body, and leave out the brain (the PLC). Once again, a complete PLC policy and procedure manual is out of the scope of this article. However, I will donate a few random items below to get you started.
Hope this helps, if you have a specific question you can find me in our PLC discussion area at the PLC Discussion Forum.
Don Fitchett (President)
Business Industrial Network